Due to a failure in the heat supply system of Lvivteploenergo, today part of Sykhov is without heating and hot water
Tonight, there was a malfunction in the heat supply system of LMKP “Lvivteploenergo”. As a result, 324 ITPs of Sykhov stopped. As of 9:30 a.m. The company’s employees have already put 175 ITPs into operation. By the end of the day, they plan to completely restore the supply of heat and hot water. As the company emphasizes, there is a suspicion of external interference with the company’s work system, but this information is being verified.
“Tonight at approximately 02:00 a.m., a failure occurred in the system of our ITPs. We suspect external interference, but this information is currently being verified by law enforcement agencies.
Therefore, our employees, using the bypass method, manually start up all the ITPs in Sikhiv that have failed. As of 9:30 a.m., 175 ITPs were already working. Restoration work continues and the number of ITPs that are resuming work is constantly growing. By the end of the day, we plan to fully restore the operation of all ITPs and restore the supply of heat and hot water,” Lvivteploenergo LMKP reported.