Within the reconstruction of the street Bandera above the retaining wall, the arrangement of the public space near the Organ Hall is in progress. The pedestrian zone has been completely paved with mosaics and tiles, so now residents and guests of Lviv will be able to comfortably walk along this area or go to a concert in the Organ Hall.
As LKP “Lvivavtodor” notes, at the end of last year, a new retaining wall was installed in this area instead of the dismantled emergency retaining wall. It was hidden underground and soon it will be a real green slope – 2,820 dogwood bushes and 21 trees will be planted here. Already after the installation of a new retaining wall with an earthen slope, they moved on to the installation of the structural layers of the pedestrian zone path, which stretches between the street. Bandera and St. Professorial.
What has been done here so far:
- a water supply network has been installed – 60 units. m
- storm sewer networks were installed – 85 units. m
- rain receivers are arranged – 7 pcs
- drainage gutters are connected – 2 pcs
- Outdoor lighting networks have been arranged – 130 rooms. m
- paved with mosaic – 830 sq.m. m
- paved with granite tiles – 870 sq. m. m
- paved with paving stones – 100 square meters. m
What remains to be done to arrange the public space:
- install external lighting lamps
- install street furniture – bench-platform (4 pcs.)
- install a drinking fountain
It is tentatively planned to complete works on the improvement of the public space and the green slope by the end of May.