Current repair of the sidewalk and paving around the house on the street. Myru, 6, is being carried out by the FOP “Fartushok”, and the repair of the road surface of the road part of the residential area near the residential buildings on the street. Tarnavskogo, 1 and St. Klyusivska, 15 – Energy LLC.
In addition, a contractor installed a drainage system on Tarnavskyi. The customer of the works is Chervonogradzhitlokomunservices KP.