As LKP “Lvivavtodor” reported, the traffic lane near the retaining wall on the street. Bandera is already open for cars and public transport. At the weekend, trams were running on this section in test mode. Starting today, December 19, trams No. 1 and No. 2 have returned to their usual routes.
“This traffic lane was closed for about 4 months due to the dismantling of the emergency retaining wall near the Organ Hall. The works are carried out within the framework of the reconstruction of the street. Banners ordered by LKP “Lvivavtodor”. As of now, the old retaining wall has already been completely dismantled, and in order to strengthen the hill near the Organ Hall, a new wall has been erected, on top of which an earthen slope with green plantings remains to be made. Due to weather conditions, these works are currently suspended,” Lvivavtodor LLP reported.
Therefore, as of today, according to the information of Lviv Electrotrans, trams No. 1 and No. 2 resumed running on their usual routes. “One” and “two” in the direction “from the center” run through Rynok Square, Doroshenko Street, Kopernyka Street. Today, there are 6 trams No. 1 with an approximate interval of 10 minutes, and 8 trams No. 2 with an approximate interval of 8 minutes.
“Our trams run according to the schedules, which provide for optimal and uniform traffic intervals on each of the routes. However, traffic delays sometimes occur for reasons independent of the activities of Lvivelectrotrans: due to traffic jams, improper parking of cars, technical reasons, etc., Lvivelectrotrans LLP explained.