Today, on 25 September, the company’s employees are replacing a section of the water supply system at 46 Hrushevskoho Street by means of rehabilitation.
The peculiarity of this method of repairing communications is that the new pipe is laid inside the old one. Sanitation is carried out without dismantling the old pipe. In this case, it serves as a case for the new water supply system.
This time, the company decided to resort to rehabilitation, as it had to repair the emergency section of the water supply system without destroying the road surface of Hrushevskoho Street.