Листи до редакції

Closure of Railway Crossing on Turka-Yablunka Section

The railway crossing on the Turka-Yablunka section will be temporarily closed.

The management of the production structural unit ‘Sambir Track Distance’ informs that the railway crossing at 133 km PC 8 will be closed to vehicular traffic on December 12, 2025, from 08:30 to 14:00. This is due to production necessity, specifically, the replacement of reinforced concrete slabs of the crossing surface.