On Thursday, work on the replacement of a 250-mm-diameter section of the water pipe near the “Lisova” mine with a length of 170 meters was completed.
They were held in rather difficult conditions in a swampy area, where, according to the director of the enterprise Volodymyr Soldat, it is difficult not only to eliminate the accident itself, but also to identify the places of gusts.
Therefore, the replacement of this section of the water pipeline will reduce water losses and reduce energy consumption for the enterprise.