The road surface of the bridge leaves much to be desired, so in order to avoid emergencies, repairs have been undertaken.
The bridge is about 120 m long and is located on the local public road C141713 Strelky – Novyi Kropyvnyk.
Back in 2021, the road surface of the Strelky – Novyi Kropyvnyk road (about 13 km) within the Sambir district was repaired. What remains to be done is to restore the bridge crossings on this road that are in need of repair.
“The road surface of the above bridge was in poor condition. The inspection revealed critical potholes and inadequate water drainage, which leads to waterlogging and destruction of bridge structures,” said Orest Shulikovsky, director of the Road Department of Lviv Regional Road Administration.
In order to prevent further destruction of the structure and avoid emergencies, it was decided to carry out a set of works to install drainage and restore the asphalt concrete pavement.
The repair works are carried out as part of the operational maintenance by the contractor Shlyakhovik-T LLC.