Влада працює

Traffic across the bridge in the village of Hayok will be temporarily blocked in Lviv Oblast. Detour scheme

The reason is repair, to put it briefly. The detour scheme is in the picture

“From 7:00 a.m. on April 25, we are blocking road traffic through the bridge crossing on the highway N-17 Lviv – Radehiv – Lutsk across the Zahidny Bug River near the village of Hayok,” reported the press service of the Highway Service in Lviv region.

Location on the map: bit.ly/bug_bridge

The overlap is due to the production necessity in the further execution of works by the subcontractor organization for the reconstruction of the crossing. Namely:

– arrangement of approaches to the building;
– replacement of the overflow pipe;
– dismantling of the temporary bridge and approaches to it;
– installation of waterproofing and drainage;
– laying structural layers of asphalt concrete road surface;
– installation of outdoor lighting;
– installation of a washing fence;
– conducting road safety measures.

The detour scheme of the bridge crossing over the Zahidnyi Bug River on the road N-17 Lviv – Radehiv – Lutsk for road transport will take place according to the route:
M-06 Kyiv-Chop along the Mali Podlisky – Busk section, T-18-06 Rivne – Mlyniv – Berestechko – Busk – Przemyslany along the Busk – Lopatyn section, T-14-10 Brody – Chervonograd along the Lopatyn – Radekhiv section and in the opposite direction .

Drivers are requested to take this information into account when planning their route, as well as to pay attention to the installed temporary road signs.

The removal of restrictions will be notified additionally.

Голос Сокальщини на GoogleNews