Влада працює

In the village of Nizhnya Yablunka, the construction work of an educational institution will be resumed

In total, the institution is designed for 360 student places.

On March 29, the Deputy Head of the Department of Capital Construction of the Lviv OVA, Roman Dulya, conducted an on-site inspection of an object of unfinished construction – a school in the village of Nizhny Yablunka. It is planned to restore the arrangement of the object already in July this year.

“The school is located in the Sambir district. Extreme works at the facility were carried out in 2019. Together with the head of the Boryn settlement council, Mykhailo Shkitak, they conducted an inspection of the three-story building, which currently requires restoration of works in terms of replacement of existing engineering networks, capital repair of corridors and re-planning of classrooms, construction of a retaining wall to prevent landslides. In accordance with the updated standards in terms of accessibility and inclusiveness of buildings, a decision was made to adjust the design and estimate documentation with full engineering and technical support and improvement of the adjacent territory. We plan to start construction work on the facility already in July this year,” he emphasized.

LODA

 

Голос Сокальщини на GoogleNews